Player Info
Show players
3 Delivery Tasks ($984)
- Deliver 6 carts of beams from sawmill to iron mine. ($216)
- Deliver 4 carts of lumber from sawmill to iron mine. ($288)
- Deliver 8 carts of logs from logging camp to sawmill. ($480)
4 Construction Tasks ($800)
- Build a track to refinery (potential $288)
- Build a track to oilfield (potential $216)
- Build a track to smelter (potential $80)
- Build a track to coalmine (potential $216)
2 Expansion Tasks (-$2200)
- Buy 4 new stake carts for beams/lumber/rail/steel (-$1000)
- Buy 4 new flat carts for logs/pipes (-$1200)
5 Find and Recover Tasks
- [?] Recover rolling stock porter_040 betsy 1. It is 11m off regular track near #9
- [?] Recover rolling stock flatcar_logs . It is 10m off regular track near #9
- [?] Recover rolling stock flatcar_logs . It is 10m off regular track near #9
- [?] Recover rolling stock flatcar_logs . It is 10m off regular track near #9
- [?] Recover rolling stock flatcar_logs . It is 10m off regular track near #9
Change background





Trees
Show
trees
cut down more than 0m of industry (can be replanted)
Show
trees cut down less than 0m of industry
Rails and beds
Show beds
Show
tracks
Show
switches
and
crossings
Show
Iron
bridge on
top of Wood bridge
Locos and carts
Show
rolling
stock
Cart coloring
Industries
Show Industry Labels
Slopes
Show
Slope
Labels 0% to
1%
Show
Slope
Labels 1% to
2%
Show
Slope
Labels
2% to 3%
Show
Slope
Labels
above 3%
I
want
to
brag with my slope using 6 decimals after the comma
Show orange max slope circles
Curves
Curve radius 0..40m
Curve radius 40..60m
Curve radius 60..120m
Curve radius 120..xm
The settings below will require a refresh of the page
Edit
Rolling Stock
Locos
Carts
Trees
Curves and Straights
1) Zoom into your map on the left, click a piece of track (not a switch or cross).2) Click on another piece of track (not a switch or cross) - not too far away.
3) Select options for type and height of bed.
4) Click the button and then download your save.
Players
Industries
Download Save